跳到主要內容區塊
熱門關鍵字:飛航安全空拍機既時航班
menu

search
民航業務

適航指令資料庫查詢

CAA-2024-04-002

依據民用航空法規,航空器所有人或使用人除應遵守本國民航局所發布適航指令,亦應遵守航空器設計國之民航主管機關所通告之適航指令。

發布日期
2024/04/15
適用性說明
This AD applies to nternational Aero Engines, LLC (IAE LLC) Model PW1122G–JM, PW1124G1–JM, PW1124G–JM, PW1127G–JM, PW1127G1–JM, PW1127G1A–JM, PW1127G1B–JM, PW1127GA–JM, PW1129G–JM, PW1130G–JM, PW1133G–JM, PW1133GA–JM, PW1428G–JM, PW1428GA–JM,PW1428GH–JM, PW1431G–JM, PW1431GA–JM, and PW1431GH–JM engines with an installed: (i) High-pressure compressor (HPC) 7th-stage integrally bladed rotor (IBR–7) having part number (P/N) 30G2307 or 30G4407; (ii) HPC 8th-stage integrally bladed rotor (IBR–8) having P/N 30G5608, 30G5908, or 30G8908; (iii) HPC rear hub having P/N 30G4008 or 30G8208; (iv) High-pressure turbine (HPT) 1st-stage hub having P/N 30G4201, 30G6201, or 30G7301; or (v) HPT 2nd-stage hub having P/N 30G3902, 30G5502, or 30G6602. (2) This AD does not apply to parts identified in paragraphs (c)(1)(i) through (v) of this AD if thoseparts were manufactured from powdered metal material produced prior to November 1, 2015, or afterSeptember 1, 2021, as identified by part serial number in Tables 1, 2, and 3 of PW Special Instruction(SI) No. 222F–23, Revision B, dated March 1, 2024 (PW SI No. 222F–23, Revision B) or in theoriginal manufacturing records for the part. (3) If the original manufacturing records do not identify the production date of the powdered metalused to make the parts identified in paragraphs (c)(1)(i) through (v) of this AD, and the part serialnumber is not listed in Tables 1, 2, and 3 of PW SI No. 222F–23, Revision B, then the part is subjectto the requirements of this AD.
型別
IAE PW1122G–JM, PW1124G1–JM, PW1124G–JM, PW1127G–JM, PW1127G1–JM, PW1127G1A–JM, PW1127G1B–JM, PW1127GA–JM, PW1129G–JM, PW1130G–JM, PW1133G–JM, PW1133GA–JM, PW1428G–JM, PW1428GA–JM,PW1428GH–JM, PW1431G–JM, PW1431GA–JM, and PW1431GH–JM engines
民航局AD編號
CAA-2024-04-002
原發布國
FAA
原AD編號
2024-05-11
生效日期
2024/04/11
主旨摘要
This AD requires performing an AUSI of the HPT 1st-stage hub, HPT 2nd-stage hub, high-pressure compressor (HPC) 7th-stage integrally bladed rotor (IBR–7), and HPC 8th-stage integrally bladed rotor (IBR–8) for cracks, and replacing if necessary. and also requires accelerated replacement of the HPC IBR–7, HPC IBR–8,HPC rear hub, HPT 1st-stage hub, and HPT 2nd-stage hub.
參考資訊(版本/ATA/SB)
This AD replaces AD 2022–19–15(CAA-2022-10-002修訂)and AD 2023–16–07(2023-09-003)。
存檔序號
113-04-002
專業分項
Powerplant
產品類別
Engine
備註
檔案下載
CAA-2024-04-002.pdf

1.本局早期(2012年前)所發布AD目前未提供檔案下載服務。如欲查詢,請自行連結原發布國民航主管機關網頁,再依”原AD編號”查詢。

2.我國目前所引進航空產品原發布國民航主管機關網頁聯結如下:
CanadaEASAFAAIsraelJapanCABUKBrazilCAA-CZ

TOP
["HostName"]:CAAWEB-AP